Scope:
Modules: Shop Design, Procurement, Fabrication, Trial‐Assembly
, FAT, and Loadout for SRU / SWS / ARU / Pipe Rack Module
(2000 T)
Pressure Vessel / Heat Exchange (42 units): Process Design,
Detail Design, Procurement, Fabrication, FAT and Installation into
Modules.
Project Duration:
March 2015 to May 2017 (26 months)