AXION Campana Refinery FGT Facility

  • Weight:Unspecified
  • 业主:Prosernat

Product Introduction

    Scope:
    Modules: Shop Design, Procurement, Fabrication, Trial‐Assembly
    , FAT, and Loadout for SRU / SWS / ARU / Pipe Rack Module
    (2000 T)
    Pressure Vessel / Heat Exchange (42 units): Process Design,
    Detail Design, Procurement, Fabrication, FAT and Installation into
    Modules.


    Project Duration:

    March 2015 to May 2017 (26 months)